01/11/2025 - Afternoon

 01/11/2025 - Afternoon - Alex Randall, Sam Hill, Tom Jackson, Alex Hannam, Chris Cooke

1no large skip brough to surface, 21 total for the year so far.

After a trip to Lillypool cafe and screwfix, AR, SH and TJ headed down Templeton, with AR and TJ working on extending the railway, and SH producing a drip collector to capture the intolerable drip in Echo Pot which has dampened our spirits since the start.

On the railway, the ladder supported rails were secured to the ladder, and lower down the next horizontal support was installed, and the next lengths of rail. We are now about 3m from the top of the ladder with the rails.

During this AH and CC arrived to inspect the works, and also busied themselves hauling the collection of rocks and bags from Echo to 166', and loaded into the skip.

SH's drip collector was mostly successful, except there is now a drip coming from the drip collector, to be solved next time.

Comments

Popular posts from this blog

01/07/2025 - Evening

22/04/2025 - Evening

26th March 2025