01/07/2025 - Alex Randall, Sam Hill, Ed Ford, George Brookes, Hollie London Two big skips surfaced, 2025 total to date: 12 Alex R used a combination of plug and feather and a hammer to remove a lump preventing the lowest ladder from being moved to the left. The aim of this is to align the ladder with the rift above, and install another ladder in the rift to act as a track, so one hoist will be able pull buckets of spoil from the bottom of the ladder to the top of the rift. There are two further lumps that will need removing, but these will require some delicate use of chemicals. The rest of the team worked tirelessly pressing the hoist buttons, with Ed loading the Echo hoist and Sam driving it, and loading the South Pot sled. George and Hollie drove the the South Pot hoist and loaded the big 166' skip. After removing the lump discussed above AR returned to surface, raised the 166' skip and sent it down for refill. Then had to deal with GB inconsiderate parking to empty the dum...
22/04/2025 - Alex Randall, Mike Kushy, Hollie London, Sam Hill - 3hrs 4no big skips lifted to surface - 2025 running total 7no. On arrival MK started up the plant and sent the surface skip down. AR arrived and continued trying to turn a beer keg into a larger skip for the Echo Pot hoist (this is using far more grinder discs and batteries than expect and may prove a complete waste of time). MK went down, filled the skip, then came back up, to raise it and empty it. HL now arrived, so MK & HL went back down as AR lowered the skip, and they filled it at the bottom then started hauling with the electric hoists lower down. Meanwhile AR went to visit Wayne, who had just arrived back from holiday, to collect supplies, and returned to site to raise the now full surface skip and send it back down with with 2no drills and other required kit. Late for the second week in a row SH now arrived. AR headed down to the end with the drilling equipment to complete the holes started last week. Th...
David Morrison (Tuska), Mike Kushy and Alex Randall. MK and DM did some more work at baby Templeton in the morning. Clearing out run in and shaping the surroundings. AR arrived around 1pm ish and we all set to work on wiring up sockets. 2 x outdoor 13amp double plug socket boxes wired up with braided 2.5mm cable, we decided we'd cut and fit the 16amp connection plugs in situ. Fired up the generator and laid the winches (with 13amp plugs fitted), tools, lights (with 13amp plugs) and drill into the sled. AR and MK headed on down to greet the sled. The first winch bracketed onto the original steel great. AR concentrated on fixing the socket box onto the wall with a wooden backing, whilst MK concentrated on cutting the braided wire to length and fitting the 16amp plug to connect into the existing wiring. Went smoothly and lights/winch worked well. We then lowered the 2nd winch, drill and tools down the South pot sled. The steel runners could do with a cleaning up/rubbing back and greas...
Comments
Post a Comment