4/03/25

Alex Ranndle and sam Hill got to the dig for 6 and kitted up. Then joined by kushy and headed down. The last charge did a excellent job of enlarging the narrowing and conpletly blocked the passage with spoil.  Sam set about clearing all this back whilst the other two hauled buckets back up the climb. Once cleared bac  a good look ahead saw the passage turning left and narrowing. Hard to tell what is going on beyond thus. The others then had a look and sam got on with drilling and setting charge. Kusky left due to a bad ankle and randle followed him to grab his drill as the hilti wasn't playing ball. Charge set using randles new exploder. 3hrs 
(Plywood for trolley lfet in shed)
Before clearing
After clearing

Passage around the left bend

Comments

Popular posts from this blog

01/07/2025 - Evening

22/04/2025 - Evening

26th March 2025