08/04/2025 - Evening

 08/04/2024

2.5 hrs - Alex Randall, Sam Hill, Oli Hill, Mike Kushy, Hollie London

SH, OH & HL headed straight down to sort out the tangle of firing cable AR had created the previous day, then started bringing spoil up from the dig to the bottom of Echo Pot.

Meanwhile AR and MK fired up the lister and attempted to send the surface skip down but were beset by technical difficulties. Eventually AR left MK to phone a friend (Tuska) for technical support and headed down to join the hauling. Phone support was unable to solve the problem so MK also headed down to begin operations with the electric winches in Echo and South pot. Lots of rock moved up to the 166' level while AR went to the bottom to apply chemicals to the holes drilled yesterday. 

Spoil wise, we've got about 6 buckets worth at the bottom that OH couldn't see somehow, and 15 bags full at the base of Echo pot, the rest is at the 166'. The main bottleneck is the Echo hoist, larger skip needed.

On the surface we found a hydraulic oil puddle, so that might go some way to explaining why we couldn't get it working.

Comments

Popular posts from this blog

01/07/2025 - Evening

22/04/2025 - Evening

26th March 2025