12/11/2025 - Evening
12/11/2025 - Evening, 2hrs, Alex Randall, Sam Hill, George Brooks
Work continuing the railway. Another brace and rail install. Very close to the join with the ladder below now, so we're almost there! Rails were also joined together. This could have been better, but we'll see how it holds out.
SH also went down with the drill and plug/feather to break up some of the larger rocks that have been peeled off during railway construction, breaking them into sizes that we'll be able to haul.
Plan going forward is that other members of the team will extend the power supply to the head of the railway over the weekend, which should hopefully allow us to take the winch from the top of South Pot down to the railway to test run the upper section, test the cable will be long enough to reach the bottom, and use it to haul all the loose rock below the rails up, so they stop falling down the rift while we're working.