18/11/2025 - Evening

18/11/2025 - Evening - 2hrs - Alex Randall, Sam Hill, George Brooks Sam headed down and started bagging up spoil in preparation of hauling. Above AR and GB put two bolts in, with tensioner and chain to securely anchor the top ladder in position, to prevent any possible sliding when hauling, and added another scaff pole to the track. The trolley was then tested on the track with a length of rope. Some derailing issue may be encountered, but when travelling slowly it appeared to work well. The winch will always be slow so with some tinkering the top section will work. Add ballast to the trolley may also help. The test runs showed a bit of wall which will need trimming off, which will be done next week, either by plug and feather or other means. It is hoped the power will also be extended down to this level over the weekend, which would allow powered testing.