11-04-26 afternoon session

With some time to spare i headed down the dig armed with a BDH of cement and sand mix. I started of removing the rest of the loose rock on right hand wall half way down on the inclined railway. The cement was then applied to the remaining loose material ( the entire wall is very loose and crumbly) With this complete I bagged up the loose stuff and stacked it half way down the railway (8 bags worth) The rest of the loose stuff from the end is also now bagged up (25bags) All set for a good session of hauling next week. Sam Solo 2hrs