03/06/25- evening session
03/06/26- evening session, Randall amd Sam. After the previous weeks issues with drill bits we set about fixing this. Alex was on point drilling and firing whilst sam was on hauling duty loading the railway then climbing up to winch it up. The only issue was that on the second haul the roller on the railway snapped of the weld leaving the wire rubbing on the scaff bars. Once Alex was finished a few bags were hauled up further and a speedy retreat was made to the pub having made a loud bang. 2.5hr
Comments
Post a Comment